Monthly Archives: March 2004

The Downstairs Bedroom

Five months later, we have finally started reconstruction of the room! It was a long winter… but that’s no excuse. We just bit off a little more than we could chew at that time. This past week I was able to remove the remaining floor joists, install a new header joist and band joists, and install most of the floor joists and some of the bridging. Hopefully I’ll be able to finish the remaining bridging during the week after work so I can start working on the floor insulation this coming weekend.

Until next time...
Erik

March 25, 2004

We’re moving the salon! After 5+ years in Rogers, we have decided to move the salon (sans tanning) to Bentonville, from where most of our clientele comes. The Husbear and I decided that tanning is not the direction we want to continue with, so we have re-geared the new salon to be more inclusive of hair services and massage therapy. We signed a five year lease today for a 1440 square-foot location in a new plaza that has just been built. The location is next door to a nail salon, so we should both be a draw for each other. Construction should be finished mid-May, so the Grand Opening should be sometime in May.

Until next time...
Erik