The Downstairs Bedroom, or “An Adventure in Patience!” Sunday, August 29, 2004 at 5:19 pmPonderingsHome Re-Construction, robertanderik.com ArchivesErik Rubright Electrical has been run, as well as coax and cat-5e. Insulation (R-19) is going in now. Until next time...36.430629-94.122318
The Downstairs Bedroom, or “An Adventure in Patience!” Saturday, August 14, 2004 at 5:18 pmPonderingsHome Re-Construction, robertanderik.com ArchivesErik Rubright Finished replacing and adding to the wall studs. Also removed the old broken window on the north side of the room and replaced it with a larger Pella window. Until next time...36.430629-94.122318