Category Archives: Ponderings

The end…. For now.

I have decided to park my blog.

Well, in as much as “park” includes still cross-posting my Instagram photos, and doing the “12 of 12” because I enjoy that.

It’s not like I’ve really blogged anything of real substance in a long, long while. Just not feeling wordy for a while, and my time seems more and more difficult to manage as of late.

I’ll still be around, and I might randomly post from time-to-time.

But for now, thank you for spending the time you’ve spent with me.

Until next time...
Erik

Hi-Fi Friday: March 10, 2017

My turn to pick the theme for the month. After two other… failed… suggestions, we agreed upon songs by Irish bands. Seems appropriate with it being March and all? But I think U2 should be left out. Since, well, U2.


Sinéad O’Controversy. But before she had that, er, title, she was well, just Sinéad. While her popularity has been somewhat lacking for the last two decades, she’s still putting out music. But I still enjoy listening to her 1990 album “I Do Not Want What I Haven’t Got”.

And from that album, I give you Sinéad O’Connor’s “The Emperor’s New Clothes”:

Until next time...
Erik

Working Me.

Just some videos of me doing one of the things I do, and probably a little more of the craziness that’s me. (I finally figured out how to grab these videos off of Facebook after they do a live thingy.) If you’re truly bored, these will kill a lot of time.

Tattooing my bestest buddy Patrick last April:

Tattooing our friend Kyle today:

Until next time...
Erik

Erections

The Husbear has grown tired of scraping frost and ice from the windshields in the winter time, so he wanted a carport. So we’re building a carport. Well, I’m building a carport. He’s assisting me. Not that we don’t have enough projects we’re constantly working on.

11/08: We've got wood!
11/08: We’ve got wood!
11/08: Starting the erection process. Such a pain.
11/08: Starting the erection process. Such a pain.
11/08: First frame up.
11/08: First frame up.
11/13: Next frame up, and overhead boards installed on one.
11/13: Next frame up, and overhead boards installed on one.
11/15: Overhead beams all installed.
11/15: Overhead beams all installed.
11/15: Another angle.
11/15: Another angle.
11/15: Height comparison compared to vehicles.
11/15: Height comparison compared to vehicles.
I got my webbing caught in the drill gearing. Ouch.
I got my webbing caught in the drill gearing. Ouch.
11/27: Lower supports and uprights installed.
11/27: Lower supports and uprights installed.
11/28: Tin roof installed. Mostly.
11/28: Tin roof installed. Mostly.
11/28: Tin roof installed. Mostly.
11/28: Tin roof installed. Mostly.

Lowe’s Delivery shorted me 10 pieces of roofing, which I finally received today. So barring any rain this coming weekend, I’ll get those last pieces installed.

There will be one other vehicle bay, but that won’t be built until sometime next year. We have to level the land for it first, but that won’t be until next year. But at least for now the Jeep and the Prius have a place to sleep.

Until next time...
Erik

I’m back…

… not that I went anywhere. I was still here physically. But I couldn’t get into my blog.

I upgraded my site to use https instead of plain-old http. And in doing so, I somehow managed to lock myself out of my wordpress database. Meaning I wasn’t able to post directly. But I finally managed to get myself in, and the remainder of the site converted over to using https instead.

Now if I could just get a stable Internet connection at home. Damn you CenturyLink. Day 3…

Until next time...
Erik